REFERENCE LIST

a) SES Aghios Georgios (PPC S.A.)

a/a

Year

SES

Description of Project

1.

2004

SES Aghios Georgios (PPC S.A.)

Design, construction, supply and installation of LP-3 preheater, Unit 9 200MW

2.

2009

SES Aghios Georgios (PPC S.A.)

Design, construction, supply and installation of LP-4 preheater, Unit 9 200MW

3.

2010

SES Aghios Georgios (PPC S.A.)

Design, construction, supply and installation of HP-2 preheater, Unit 8 160MW

4.

2003

SES Aghios Georgios (PPC S.A.)

Repair of 200MW Electrosila generator Unit 9 by installing dynamic accumulators of iron tightening and sealing rings

5.

2006

SES Aghios Georgios (PPC S.A.)

Repair of main cooler circulation pump Unit 9 by supplying new upgraded rotor

6.

2007

SES Aghios Georgios (PPC S.A.)

Design, supply, installation and commissioning of digital regulator of GE EX2000 excitation system of 200MW generator Unit 9

7.

2004

SES Aghios Georgios (PPC S.A.)

Total upgrade of excitation system of 200MW Electrosila generator

8.

2004

SES Aghios Georgios (PPC S.A.)

Total repair of 200MW LMZ steam turbine, Unit 9

9.

2004

SES Aghios Georgios (PPC S.A.)

Design, supply and installation of LISEGA suspensions at 200MW steam turbine steam pipes

10.

2000-2010

SES Aghios Georgios (PPC S.A.)

Spare parts supply for 200MW Electrosila generator Unit 9

11.

2000-2010

SES Aghios Georgios (PPC S.A.)

Spare parts supply for steam turbine LMZ 200MW Unit 9

12.

2004

SES Aghios Georgios (PPC S.A.)

Supply, installation and commissioning of crack diagnostic system at last step bladings Low Pressure Rotor of steam turbine K-200-130 LMZ 200MW Unit 9


b) SES Meliti (PPC S.A.)

a/a

Year

SES

Description of Project

1.

2006

SES Meliti (PPC S.A.)

Design, supply, installation and commissioning of excitation system of 360 MW Electrosila generator Unit 1

2.

2008

SES Meliti (PPC S.A.)

Spare parts supply for K-330-2Y3 LMZ steam turbine Unit 1

3.

2012

SES Meliti (PPC S.A.)

Total repair of 360MW Electrosila generator by stator iron tightening and running tests

4.

2012

SES Meliti (PPC S.A.)

Total repair of 360MW LMZ steam turbine


c) SES Amyntaion-Filotas (PPC S.A.)

a/a

Year

SES

Description of Project

1.

1997

SES Amyntaion-Filotas (PPC S.A.)

Repair of Electrosila 300MW generator Unit 1 by installing dynamic accumulators

2.

1998

SES Amyntaion-Filotas (PPC S.A.)

Repair of Electrosila 300MW generator Unit 2 by installing dynamic accumulators

3.

2009

SES Amyntaion-Filotas (PPC S.A.)

Design, supply, installation and commissioning on monitoring and diagnostic system for vibration of 300MW turbogenerator Unit 2

4.

2009

SES Amyntaion-Filotas (PPC S.A.)

Design, supply, installation and commissioning of crack diagnostic system at last step bladings Low Pressure Rotor and Medium Pressure Rotor 300MW Unit 2

5.

2009

SES Amyntaion-Filotas (PPC S.A.)

Non-destructive testing at LP, MP and LP rotors of LMZ steam turbine Unit 1

6.

2010

SES Amyntaion-Filotas (PPC S.A.)

Non-destructive testing at LP, MP and LP rotors of LMZ steam turbine Unit 1

 

d) SES Kardia (PPC S.A.)

a/a

Year

SES

Description of Project

1.

2003

SES Kardia (PPC S.A.)

Repair of 300MW Electrosila generator by installing dynamic accumulators and rotor sealing rings Unit 3

2.

2004

SES Kardia (PPC S.A.)

Repair of 300MW Electrosila generator by installing dynamic accumulators and rotor sealing rings Unit 4

3.

2009

SES Kardia (PPC S.A.)

Design, supply, installation and commissioning of VIDAS (vibration monitoring and diagnostic) system of LMZ/Electrosila turbogenerator Unit 3

4.

2010

SES Kardia (PPC S.A.)

Design, supply, installation and commissioning of VIDAS (vibration monitoring and diagnostic) system of LMZ/Electrosila turbogenerator Unit 4


e) SES Aghios Dimitrios (PPC S.A.)

a/a

Year

SES

Description of Project

1.

2003

SES Aghios Dimitrios (PPC S.A.)

Design, supply, installation and commissioning of VIDAS (vibration monitoring and diagnostic) system of 300MW turbogenerator Unit 3

2.

2008

SES Aghios Dimitrios (PPC S.A.)

Design, supply, installation and commissioning of VIDAS (vibration monitoring and diagnostic) system of 300MW turbogenerator Unit 4

3.

2009

SES Aghios Dimitrios (PPC S.A.)

Total repair of 300MW Electrosila generator by installing sealing rings of new type 

4.

2009

SES Aghios Dimitrios (PPC S.A.)

Non-destructive testing works of high, medium and low pressure rotor of LMZ steam turbine 300MW Unit 3

5.

2009

SES Aghios Dimitrios (PPC S.A.)

Non-destructive testing works of high, medium and low pressure rotor of LMZ steam turbine 300MW Unit 4


 

f) SES Costanera (Buenos Aires, Argentina)

a/a

Year

SES

Description of Project

1.

2009

SES Costanera

Low pressure rotor Κ-300-240 LMZ steam turbine Unit 8

2.

2009

SES Costanera

Spare parts supply for high pressure rotor of Κ-300-240 LMZ steam turbine Unit 8 for reconditioning turbine blades

3.

2009

SES Costanera

Blades spare parts supply for low pressure rotor of Κ-300-240 LMZ steam turbine Unit 8 for reconditioning turbine blades

4.

2013

SES Costanera

Spare parts supply for steam tyrbine K-300-240 LMZ Unit 8